New Scotland Ave over 87IX RTE I87
FairAlbany County, New York · 2.39MI NW INT23 on I87 · Structure no. 000000005513580
- Built
- 1954
- 71 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 249 ft
- 4 main spans
- Daily traffic
- 8,136
- 2018 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
New Scotland Ave over 87IX RTE I87 is a steel stringer/multi-beam or girder carrying New Scotland Ave over 87IX RTE I87 in Albany County, New York. It was built in 1954, so it is 71 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,136 vehicles a day, roughly 3% of them trucks, projected to reach 9,883 by 2041. The structure is 249 ft (75.9 m) long and 69 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was New Scotland Ave over 87IX RTE I87 built?
It was built in 1954, making it 71 years old in 2025.
What condition is New Scotland Ave over 87IX RTE I87 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does New Scotland Ave over 87IX RTE I87 carry?
About 8,136 vehicles per day (2018 count), of which roughly 3% are trucks.
How long is New Scotland Ave over 87IX RTE I87?
The structure is 249 ft (75.9 m) long with a longest span of 65 ft (19.8 m) and a deck 69 ft wide.
Who owns New Scotland Ave over 87IX RTE I87?
It is owned by the State Toll Authority.