RTE I90 over 787IX 90IX EB Ramp 787
FairAlbany County, New York · JCT I90 & I787 · Structure no. 000000001092432
- Built
- 1968
- 57 years old, rebuilt 2014
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 320 ft
- 3 main spans
- Daily traffic
- 46,740
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
RTE I90 over 787IX 90IX EB Ramp 787 is a steel stringer/multi-beam or girder carrying RTE I90 over 787IX 90IX EB Ramp 787 in Albany County, New York. It was built in 1968 and reconstructed in 2014, so it is 57 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 46,740 vehicles a day, roughly 6% of them trucks, projected to reach 74,068 by 2041. The structure is 320 ft (97.5 m) long and 33 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I90 over 787IX 90IX EB Ramp 787 built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2014.
What condition is RTE I90 over 787IX 90IX EB Ramp 787 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does RTE I90 over 787IX 90IX EB Ramp 787 carry?
About 46,740 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is RTE I90 over 787IX 90IX EB Ramp 787?
The structure is 320 ft (97.5 m) long with a longest span of 112 ft (34.1 m) and a deck 33 ft wide.
Who owns RTE I90 over 787IX 90IX EB Ramp 787?
It is owned by the State Highway Agency.