SR 518 Snyder Ave over US 395
GoodCarson City, Nevada · SE of Carson City · Structure no. H2285
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected May 2022
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 357 ft
- 2 main spans
- Daily traffic
- 1,450
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
SR 518 Snyder Ave over US 395 is a prestressed concrete continuous box beam or girders - single or spread carrying SR 518 Snyder Ave over US 395 in Carson City, Nevada. It was built in 2013, so it is 12 years old, younger than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,450 vehicles a day, roughly 1% of them trucks, projected to reach 5,000 by 2040. The structure is 357 ft (108.8 m) long and 48 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 518 Snyder Ave over US 395 built?
It was built in 2013, making it 12 years old in 2025.
What condition is SR 518 Snyder Ave over US 395 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.
How much traffic does SR 518 Snyder Ave over US 395 carry?
About 1,450 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is SR 518 Snyder Ave over US 395?
The structure is 357 ft (108.8 m) long with a longest span of 190 ft (57.9 m) and a deck 48 ft wide.
Who owns SR 518 Snyder Ave over US 395?
It is owned by the State Highway Agency.