US Bridges

I 580 over SR431 Mt Rose Hw

Good

Washoe County, Nevada · Reno · Structure no. I1949N

Built
1995
30 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
353 ft
2 main spans
Daily traffic
23,000
2021 count
Owner
State
State Highway Agency

About this bridge

I 580 over SR431 Mt Rose Hw is a prestressed concrete continuous box beam or girders - single or spread carrying I 580 over SR431 Mt Rose Hw in Washoe County, Nevada. It was built in 1995, so it is 30 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 23,000 vehicles a day, roughly 6% of them trucks, projected to reach 52,120 by 2040. The structure is 353 ft (107.6 m) long and 85 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI 580
CrossesSR431 Mt Rose Hw
LocationReno
RouteInterstate 580
StateNevada
Coordinates39.39701, -119.75794
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length353 ft (107.6 m)
Longest span192 ft (58.5 m)
Deck width85 ft (25.8 m)
Roadway width81 ft (24.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic23,000 (2021)
Projected traffic52,120 by 2040
Trucks6%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 580 over SR431 Mt Rose Hw built?

It was built in 1995, making it 30 years old in 2025.

What condition is I 580 over SR431 Mt Rose Hw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does I 580 over SR431 Mt Rose Hw carry?

About 23,000 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is I 580 over SR431 Mt Rose Hw?

The structure is 353 ft (107.6 m) long with a longest span of 192 ft (58.5 m) and a deck 85 ft wide.

Who owns I 580 over SR431 Mt Rose Hw?

It is owned by the State Highway Agency.