US Bridges

I 580 SB over 2nd St/Glendale Ave

Good

Washoe County, Nevada · Reno · Structure no. I1253S

Built
2022
3 years old
Condition
Good
inspected May 2024
Type
Box Beam or Girders - Single or Spread
Steel
Length
165 ft
1 main span
Daily traffic
170,000
2021 count
Owner
State
State Highway Agency

About this bridge

I 580 SB over 2nd St/Glendale Ave is a steel box beam or girders - single or spread carrying I 580 SB over 2nd St/Glendale Ave in Washoe County, Nevada. It was built in 2022, so it is 3 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 170,000 vehicles a day, roughly 3% of them trucks, projected to reach 225,000 by 2040. The structure is 165 ft (50.3 m) long and 109 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI 580 SB
Crosses2nd St/Glendale Ave
LocationReno
RouteInterstate 580
StateNevada
Coordinates39.52747, -119.78387
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length165 ft (50.3 m)
Longest span160 ft (48.8 m)
Deck width109 ft (33.2 m)
Roadway width105 ft (32.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic170,000 (2021)
Projected traffic225,000 by 2040
Trucks3%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 580 SB over 2nd St/Glendale Ave built?

It was built in 2022, making it 3 years old in 2025.

What condition is I 580 SB over 2nd St/Glendale Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does I 580 SB over 2nd St/Glendale Ave carry?

About 170,000 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is I 580 SB over 2nd St/Glendale Ave?

The structure is 165 ft (50.3 m) long with a longest span of 160 ft (48.8 m) and a deck 109 ft wide.

Who owns I 580 SB over 2nd St/Glendale Ave?

It is owned by the State Highway Agency.