US Bridges

Veterans Parkway over Yori Drain

Fair

Washoe County, Nevada · Southeast Connector · Structure no. B3110N

Built
2018
7 years old
Condition
Fair
inspected April 2024
Type
Slab
Concrete Continuous
Length
90 ft
3 main spans
Daily traffic
11,900
2021 count
Owner
County
County Highway Agency

About this bridge

Veterans Parkway over Yori Drain is a concrete continuous slab carrying Veterans Parkway over Yori Drain in Washoe County, Nevada. It was built in 2018, so it is 7 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,900 vehicles a day, roughly 3% of them trucks, projected to reach 18,500 by 2037. The structure is 90 ft (27.4 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesVeterans Parkway
CrossesYori Drain
LocationSoutheast Connector
RouteCity Street 0
StateNevada
Coordinates39.50455, -119.72325
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length90 ft (27.4 m)
Longest span36 ft (11 m)
Deck width48 ft (14.6 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,900 (2021)
Projected traffic18,500 by 2037
Trucks3%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Veterans Parkway over Yori Drain built?

It was built in 2018, making it 7 years old in 2025.

What condition is Veterans Parkway over Yori Drain in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Veterans Parkway over Yori Drain carry?

About 11,900 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is Veterans Parkway over Yori Drain?

The structure is 90 ft (27.4 m) long with a longest span of 36 ft (11 m) and a deck 48 ft wide.

Who owns Veterans Parkway over Yori Drain?

It is owned by the County Highway Agency.