Longley LN over Airport Slough
FairWashoe County, Nevada · Reno · Structure no. B1580
- Built
- 1965
- 60 years old, rebuilt 1978
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 78 ft
- 4 main spans
- Daily traffic
- 14,800
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Longley LN over Airport Slough is a wood or timber stringer/multi-beam or girder carrying Longley LN over Airport Slough in Washoe County, Nevada. It was built in 1965 and reconstructed in 1978, so it is 60 years old, older than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,800 vehicles a day, roughly 3% of them trucks, projected to reach 39,462 by 2040. The structure is 78 ft (23.8 m) long and 63 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Longley LN over Airport Slough built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1978.
What condition is Longley LN over Airport Slough in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Longley LN over Airport Slough carry?
About 14,800 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is Longley LN over Airport Slough?
The structure is 78 ft (23.8 m) long with a longest span of 25 ft (7.6 m) and a deck 63 ft wide.
Who owns Longley LN over Airport Slough?
It is owned by the City or Municipal Highway Agency.