SR 208 Topaz RD over W Walker Rvr Wilson C
FairLyon County, Nevada · East of Smith · Structure no. B 778
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected April 2023
- Type
- Slab
- Concrete Continuous
- Length
- 123 ft
- 3 main spans
- Daily traffic
- 1,500
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
SR 208 Topaz RD over W Walker Rvr Wilson C is a concrete continuous slab carrying SR 208 Topaz RD over W Walker Rvr Wilson C in Lyon County, Nevada. It was built in 1959, so it is 66 years old, older than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,500 vehicles a day, roughly 11% of them trucks, projected to reach 2,500 by 2040. The structure is 123 ft (37.5 m) long and 37 ft wide. If it were closed, the detour would be 77.1 mi (124 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 208 Topaz RD over W Walker Rvr Wilson C built?
It was built in 1959, making it 66 years old in 2025.
What condition is SR 208 Topaz RD over W Walker Rvr Wilson C in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does SR 208 Topaz RD over W Walker Rvr Wilson C carry?
About 1,500 vehicles per day (2017 count), of which roughly 11% are trucks.
How long is SR 208 Topaz RD over W Walker Rvr Wilson C?
The structure is 123 ft (37.5 m) long with a longest span of 48 ft (14.6 m) and a deck 37 ft wide.
Who owns SR 208 Topaz RD over W Walker Rvr Wilson C?
It is owned by the State Highway Agency.