US Bridges

FREU02 over Humboldt River

Good

Eureka County, Nevada · Dunphy · Structure no. B 395

Built
2015
10 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
153 ft
1 main span
Daily traffic
100
2017 count
Owner
State
State Highway Agency

About this bridge

FREU02 over Humboldt River is a steel continuous stringer/multi-beam or girder carrying FREU02 over Humboldt River in Eureka County, Nevada. It was built in 2015, so it is 10 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 2% of them trucks, projected to reach 110 by 2040. The structure is 153 ft (46.6 m) long and 35 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesFREU02
CrossesHumboldt River
LocationDunphy
RouteCounty Highway 0EU02
StateNevada
Coordinates40.70539, -116.53104
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.3 US tons
Inventory rating41.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length153 ft (46.6 m)
Longest span150 ft (45.7 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2017)
Projected traffic110 by 2040
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FREU02 over Humboldt River built?

It was built in 2015, making it 10 years old in 2025.

What condition is FREU02 over Humboldt River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does FREU02 over Humboldt River carry?

About 100 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is FREU02 over Humboldt River?

The structure is 153 ft (46.6 m) long with a longest span of 150 ft (45.7 m) and a deck 35 ft wide.

Who owns FREU02 over Humboldt River?

It is owned by the State Highway Agency.