US Bridges

Bullion RD over Sfk Humboldt Rv

Good

Elko County, Nevada · Southwest of Elko · Structure no. B1628

Built
2007
18 years old
Condition
Good
inspected August 2022
Type
Stringer/Multi-beam or Girder
Steel
Length
71 ft
1 main span
Daily traffic
23
2017 count
Owner
County
County Highway Agency

About this bridge

Bullion RD over Sfk Humboldt Rv is a steel stringer/multi-beam or girder carrying Bullion RD over Sfk Humboldt Rv in Elko County, Nevada. It was built in 2007, so it is 18 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 23 vehicles a day, projected to reach 25 by 2040. The structure is 71 ft (21.7 m) long and 25 ft wide. If it were closed, the detour would be 19.3 mi (31 km).

CarriesBullion RD
CrossesSfk Humboldt Rv
LocationSouthwest of Elko
RouteCounty Highway 0
StateNevada
Coordinates40.7073, -115.83663
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating98.2 US tons
Inventory rating49.3 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length71 ft (21.7 m)
Longest span70 ft (21.3 m)
Deck width25 ft (7.6 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic23 (2017)
Projected traffic25 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.3 mi (31 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bullion RD over Sfk Humboldt Rv built?

It was built in 2007, making it 18 years old in 2025.

What condition is Bullion RD over Sfk Humboldt Rv in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2022.

How much traffic does Bullion RD over Sfk Humboldt Rv carry?

About 23 vehicles per day (2017 count).

How long is Bullion RD over Sfk Humboldt Rv?

The structure is 71 ft (21.7 m) long with a longest span of 70 ft (21.3 m) and a deck 25 ft wide.

Who owns Bullion RD over Sfk Humboldt Rv?

It is owned by the County Highway Agency.