BIA IRR RTE 203 over Sheep Creek
FairElko County, Nevada · 17.3 KM SW of Owyhee · Structure no. 0000H64641B0327
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected October 2024
- Type
- Girder and Floorbeam System
- Wood or Timber
- Length
- 158 ft
- 13 main spans
- Daily traffic
- 5
- 2024 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
BIA IRR RTE 203 over Sheep Creek is a wood or timber girder and floorbeam system carrying BIA IRR RTE 203 over Sheep Creek in Elko County, Nevada. It was built in 1988, so it is 37 years old, older than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: open, posting recommended but not legally implemented.
It carries about 5 vehicles a day, projected to reach 5 by 2044. The structure is 158 ft (48.1 m) long and 12 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was BIA IRR RTE 203 over Sheep Creek built?
It was built in 1988, making it 37 years old in 2025.
What condition is BIA IRR RTE 203 over Sheep Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does BIA IRR RTE 203 over Sheep Creek carry?
About 5 vehicles per day (2024 count).
How long is BIA IRR RTE 203 over Sheep Creek?
The structure is 158 ft (48.1 m) long with a longest span of 12 ft (3.7 m) and a deck 12 ft wide.
Who owns BIA IRR RTE 203 over Sheep Creek?
It is owned by the Bureau of Indian Affairs.