US Bridges

Skye Canyon Prk DR over US 95

Good

Clark County, Nevada · Northwest of L.V · Structure no. I2896

Built
2010
15 years old
Condition
Good
inspected February 2021
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
226 ft
2 main spans
Daily traffic
10,000
2017 count
Owner
State
State Highway Agency

About this bridge

Skye Canyon Prk DR over US 95 is a prestressed concrete continuous box beam or girders - single or spread carrying Skye Canyon Prk DR over US 95 in Clark County, Nevada. It was built in 2010, so it is 15 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,000 vehicles a day, roughly 3% of them trucks, projected to reach 20,681 by 2040. The structure is 226 ft (69 m) long and 259 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSkye Canyon Prk DR
CrossesUS 95
LocationNorthwest of L.V
RouteCity Street 0
StateNevada
Coordinates36.31447, -115.30047
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length226 ft (69 m)
Longest span111 ft (33.8 m)
Deck width259 ft (79 m)
Roadway width233 ft (71 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,000 (2017)
Projected traffic20,681 by 2040
Trucks3%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Skye Canyon Prk DR over US 95 built?

It was built in 2010, making it 15 years old in 2025.

What condition is Skye Canyon Prk DR over US 95 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2021.

How much traffic does Skye Canyon Prk DR over US 95 carry?

About 10,000 vehicles per day (2017 count), of which roughly 3% are trucks.

How long is Skye Canyon Prk DR over US 95?

The structure is 226 ft (69 m) long with a longest span of 111 ft (33.8 m) and a deck 259 ft wide.

Who owns Skye Canyon Prk DR over US 95?

It is owned by the State Highway Agency.