US Bridges

Aliante Pkwy over Cc 215

Good

Clark County, Nevada · North of Las Vegas · Structure no. I2330

Built
2009
16 years old
Condition
Good
inspected February 2021
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
280 ft
2 main spans
Daily traffic
23,100
2017 count
Owner
County
County Highway Agency

About this bridge

Aliante Pkwy over Cc 215 is a prestressed concrete continuous box beam or girders - single or spread carrying Aliante Pkwy over Cc 215 in Clark County, Nevada. It was built in 2009, so it is 16 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 23,100 vehicles a day, roughly 2% of them trucks, projected to reach 47,774 by 2040. The structure is 280 ft (85.3 m) long and 151 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesAliante Pkwy
CrossesCc 215
LocationNorth of Las Vegas
RouteCity Street 0
StateNevada
Coordinates36.28981, -115.18029
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.2 US tons
Inventory rating45.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length280 ft (85.3 m)
Longest span146 ft (44.5 m)
Deck width151 ft (46 m)
Roadway width136 ft (41.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic23,100 (2017)
Projected traffic47,774 by 2040
Trucks2%
Lanes on structure10
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Aliante Pkwy over Cc 215 built?

It was built in 2009, making it 16 years old in 2025.

What condition is Aliante Pkwy over Cc 215 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2021.

How much traffic does Aliante Pkwy over Cc 215 carry?

About 23,100 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Aliante Pkwy over Cc 215?

The structure is 280 ft (85.3 m) long with a longest span of 146 ft (44.5 m) and a deck 151 ft wide.

Who owns Aliante Pkwy over Cc 215?

It is owned by the County Highway Agency.