US Bridges

Access Road to T3 over Access Road

Fair

Clark County, Nevada · SE Las Vegas Airport · Structure no. H2997M

Built
2012
13 years old
Condition
Fair
inspected February 2022
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
407 ft
4 main spans
Daily traffic
1,500
2017 count
Owner
Local
Other Local Agency

About this bridge

Access Road to T3 over Access Road is a prestressed concrete continuous box beam or girders - single or spread carrying Access Road to T3 over Access Road in Clark County, Nevada. It was built in 2012, so it is 13 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,500 vehicles a day, roughly 1% of them trucks, projected to reach 3,102 by 2040. The structure is 407 ft (124.1 m) long and 35 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesAccess Road to T3
CrossesAccess Road
LocationSE Las Vegas Airport
RouteCounty Highway 0
StateNevada
Coordinates36.08682, -115.14227
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating62.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 25 or greater
Structure length407 ft (124.1 m)
Longest span117 ft (35.7 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2017)
Projected traffic3,102 by 2040
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Access Road to T3 over Access Road built?

It was built in 2012, making it 13 years old in 2025.

What condition is Access Road to T3 over Access Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2022.

How much traffic does Access Road to T3 over Access Road carry?

About 1,500 vehicles per day (2017 count), of which roughly 1% are trucks.

How long is Access Road to T3 over Access Road?

The structure is 407 ft (124.1 m) long with a longest span of 117 ft (35.7 m) and a deck 35 ft wide.

Who owns Access Road to T3 over Access Road?

It is owned by the Other Local Agency.