US Bridges

I 15 North Cd over Offramp LVB&15NB to 215W

Good

Clark County, Nevada · South Las Vegas · Structure no. H2952

Built
2011
14 years old
Condition
Good
inspected November 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
129 ft
1 main span
Daily traffic
8,000
2017 count
Owner
State
State Highway Agency

About this bridge

I 15 North Cd over Offramp LVB&15NB to 215W is a prestressed concrete box beam or girders - single or spread carrying I 15 North Cd over Offramp LVB&15NB to 215W in Clark County, Nevada. It was built in 2011, so it is 14 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,000 vehicles a day, roughly 1% of them trucks, projected to reach 16,545 by 2040. The structure is 129 ft (39.3 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 15 North Cd
CrossesOfframp LVB&15NB to 215W
LocationSouth Las Vegas
RouteState Highway 0
StateNevada
Coordinates36.06539, -115.18034
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.5 US tons
Inventory rating66.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length129 ft (39.3 m)
Longest span128 ft (39 m)
Deck width44 ft (13.3 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,000 (2017)
Projected traffic16,545 by 2040
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 15 North Cd over Offramp LVB&15NB to 215W built?

It was built in 2011, making it 14 years old in 2025.

What condition is I 15 North Cd over Offramp LVB&15NB to 215W in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does I 15 North Cd over Offramp LVB&15NB to 215W carry?

About 8,000 vehicles per day (2017 count), of which roughly 1% are trucks.

How long is I 15 North Cd over Offramp LVB&15NB to 215W?

The structure is 129 ft (39.3 m) long with a longest span of 128 ft (39 m) and a deck 44 ft wide.

Who owns I 15 North Cd over Offramp LVB&15NB to 215W?

It is owned by the State Highway Agency.