US Bridges

Offramp 215W over Offramp 15SB to 215E&LVB

Good

Clark County, Nevada · South Las Vegas · Structure no. H2949

Built
2011
14 years old
Condition
Good
inspected February 2021
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
230 ft
2 main spans
Daily traffic
13,200
2021 count
Owner
State
State Highway Agency

About this bridge

Offramp 215W over Offramp 15SB to 215E&LVB is a prestressed concrete continuous box beam or girders - single or spread carrying Offramp 215W over Offramp 15SB to 215E&LVB in Clark County, Nevada. It was built in 2011, so it is 14 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,200 vehicles a day, roughly 1% of them trucks, projected to reach 15,511 by 2040. The structure is 230 ft (70 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesOfframp 215W
CrossesOfframp 15SB to 215E&LVB
LocationSouth Las Vegas
RouteState Lands Road 215
StateNevada
Coordinates36.06128, -115.18115
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.1 US tons
Inventory rating65 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length230 ft (70 m)
Longest span113 ft (34.5 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,200 (2021)
Projected traffic15,511 by 2040
Trucks1%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Offramp 215W over Offramp 15SB to 215E&LVB built?

It was built in 2011, making it 14 years old in 2025.

What condition is Offramp 215W over Offramp 15SB to 215E&LVB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2021.

How much traffic does Offramp 215W over Offramp 15SB to 215E&LVB carry?

About 13,200 vehicles per day (2021 count), of which roughly 1% are trucks.

How long is Offramp 215W over Offramp 15SB to 215E&LVB?

The structure is 230 ft (70 m) long with a longest span of 113 ft (34.5 m) and a deck 31 ft wide.

Who owns Offramp 215W over Offramp 15SB to 215E&LVB?

It is owned by the State Highway Agency.