US Bridges

CC-215N over Summerlin Centre DR

Good

Clark County, Nevada · West of Las Vegas · Structure no. H2320N

Built
2000
25 years old
Condition
Good
inspected November 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
199 ft
2 main spans
Daily traffic
59,000
2021 count
Owner
County
County Highway Agency

About this bridge

CC-215N over Summerlin Centre DR is a prestressed concrete continuous box beam or girders - single or spread carrying CC-215N over Summerlin Centre DR in Clark County, Nevada. It was built in 2000, so it is 25 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 59,000 vehicles a day, projected to reach 18,613 by 2040. The structure is 199 ft (60.6 m) long and 89 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCC-215N
CrossesSummerlin Centre DR
LocationWest of Las Vegas
RouteCounty Highway 215
StateNevada
Coordinates36.15364, -115.33681
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating73.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length199 ft (60.6 m)
Longest span99 ft (30.2 m)
Deck width89 ft (27.1 m)
Roadway width86 ft (26.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic59,000 (2021)
Projected traffic18,613 by 2040
Trucks0%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CC-215N over Summerlin Centre DR built?

It was built in 2000, making it 25 years old in 2025.

What condition is CC-215N over Summerlin Centre DR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does CC-215N over Summerlin Centre DR carry?

About 59,000 vehicles per day (2021 count).

How long is CC-215N over Summerlin Centre DR?

The structure is 199 ft (60.6 m) long with a longest span of 99 ft (30.2 m) and a deck 89 ft wide.

Who owns CC-215N over Summerlin Centre DR?

It is owned by the County Highway Agency.