US Bridges

Arroyo Grande Bl over I 215

Good

Clark County, Nevada · Henderson · Structure no. H1961

Built
1999
26 years old
Condition
Good
inspected October 2021
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
251 ft
2 main spans
Daily traffic
5,900
2017 count
Owner
County
County Highway Agency

About this bridge

Arroyo Grande Bl over I 215 is a prestressed concrete continuous box beam or girders - multiple carrying Arroyo Grande Bl over I 215 in Clark County, Nevada. It was built in 1999, so it is 26 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,900 vehicles a day, projected to reach 12,202 by 2040. The structure is 251 ft (76.5 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesArroyo Grande Bl
CrossesI 215
LocationHenderson
RouteCity Street 0
StateNevada
Coordinates36.02823, -115.05604
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating62.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length251 ft (76.5 m)
Longest span129 ft (39.3 m)
Deck width82 ft (24.9 m)
Roadway width69 ft (21 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,900 (2017)
Projected traffic12,202 by 2040
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Arroyo Grande Bl over I 215 built?

It was built in 1999, making it 26 years old in 2025.

What condition is Arroyo Grande Bl over I 215 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2021.

How much traffic does Arroyo Grande Bl over I 215 carry?

About 5,900 vehicles per day (2017 count).

How long is Arroyo Grande Bl over I 215?

The structure is 251 ft (76.5 m) long with a longest span of 129 ft (39.3 m) and a deck 82 ft wide.

Who owns Arroyo Grande Bl over I 215?

It is owned by the County Highway Agency.