Clark County, Nevada · S.W of Las Vegas · Structure no. G1994S

Built
1998
27 years old, rebuilt 2007
Condition
Fair
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
243 ft
3 main spans
Daily traffic
96,500
2017 count
Owner
County
County Highway Agency

About this bridge

Cc 215 over Rail Road is a prestressed concrete continuous box beam or girders - multiple carrying Cc 215 over Rail Road in Clark County, Nevada. It was built in 1998 and reconstructed in 2007, so it is 27 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 96,500 vehicles a day, roughly 5% of them trucks, projected to reach 199,573 by 2040. The structure is 243 ft (74.2 m) long and 100 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCc 215
CrossesRail Road
LocationS.W of Las Vegas
RouteInterstate 215
StateNevada
Coordinates36.06834, -115.20326
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment9: Superior to present desirable criteria
Operating rating78.4 US tons
Inventory rating46.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length243 ft (74.2 m)
Longest span88 ft (26.8 m)
Deck width100 ft (30.5 m)
Roadway width60 ft (18.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic96,500 (2017)
Projected traffic199,573 by 2040
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Cc 215 over Rail Road built?

It was built in 1998, making it 27 years old in 2025. It was reconstructed in 2007.

What condition is Cc 215 over Rail Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Cc 215 over Rail Road carry?

About 96,500 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Cc 215 over Rail Road?

The structure is 243 ft (74.2 m) long with a longest span of 88 ft (26.8 m) and a deck 100 ft wide.

Who owns Cc 215 over Rail Road?

It is owned by the County Highway Agency.