Carey Av over I 15 UPRR & Conc.Chan
FairClark County, Nevada · North Las Vegas · Structure no. G 953
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected January 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 492 ft
- 6 main spans
- Daily traffic
- 12,500
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Carey Av over I 15 UPRR & Conc.Chan is a concrete continuous box beam or girders - multiple carrying Carey Av over I 15 UPRR & Conc.Chan in Clark County, Nevada. It was built in 1971, so it is 54 years old, older than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,500 vehicles a day, roughly 5% of them trucks, projected to reach 26,886 by 2040. The structure is 492 ft (150 m) long and 77 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Carey Av over I 15 UPRR & Conc.Chan built?
It was built in 1971, making it 54 years old in 2025.
What condition is Carey Av over I 15 UPRR & Conc.Chan in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Carey Av over I 15 UPRR & Conc.Chan carry?
About 12,500 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is Carey Av over I 15 UPRR & Conc.Chan?
The structure is 492 ft (150 m) long with a longest span of 97 ft (29.6 m) and a deck 77 ft wide.
Who owns Carey Av over I 15 UPRR & Conc.Chan?
It is owned by the State Highway Agency.