US Bridges

Las Palmas Entrada over Wash

Fair

Clark County, Nevada · Henderson · Structure no. B3191

Built
2000
25 years old
Condition
Fair
inspected December 2023
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
1,500
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Las Palmas Entrada over Wash is a concrete culvert carrying Las Palmas Entrada over Wash in Clark County, Nevada. It was built in 2000, so it is 25 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,500 vehicles a day, projected to reach 3,102 by 2040. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesLas Palmas Entrada
CrossesWash
LocationHenderson
RouteCity Street 0
StateNevada
Coordinates36.02984, -115.01484
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating33.1 US tons
Inventory rating25.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2017)
Projected traffic3,102 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Las Palmas Entrada over Wash built?

It was built in 2000, making it 25 years old in 2025.

What condition is Las Palmas Entrada over Wash in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does Las Palmas Entrada over Wash carry?

About 1,500 vehicles per day (2017 count).

How long is Las Palmas Entrada over Wash?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m).

Who owns Las Palmas Entrada over Wash?

It is owned by the City or Municipal Highway Agency.