US Bridges

East Galleria Driv over Channel

Good

Clark County, Nevada · Henderson · Structure no. B3043

Built
2007
18 years old
Condition
Good
inspected February 2021
Type
Stringer/Multi-beam or Girder
Steel
Length
108 ft
1 main span
Daily traffic
4,200
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

East Galleria Driv over Channel is a steel stringer/multi-beam or girder carrying East Galleria Driv over Channel in Clark County, Nevada. It was built in 2007, so it is 18 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,200 vehicles a day, roughly 1% of them trucks, projected to reach 6,550 by 2040. The structure is 108 ft (32.9 m) long and 108 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesEast Galleria Driv
CrossesChannel
LocationHenderson
RouteCity Street 0
StateNevada
Coordinates36.07416, -114.95857
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating64.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length108 ft (32.9 m)
Longest span97 ft (29.6 m)
Deck width108 ft (32.9 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,200 (2017)
Projected traffic6,550 by 2040
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was East Galleria Driv over Channel built?

It was built in 2007, making it 18 years old in 2025.

What condition is East Galleria Driv over Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2021.

How much traffic does East Galleria Driv over Channel carry?

About 4,200 vehicles per day (2017 count), of which roughly 1% are trucks.

How long is East Galleria Driv over Channel?

The structure is 108 ft (32.9 m) long with a longest span of 97 ft (29.6 m) and a deck 108 ft wide.

Who owns East Galleria Driv over Channel?

It is owned by the City or Municipal Highway Agency.