Craig RD over Gowan N Channel
FairClark County, Nevada · Las Vegas · Structure no. B2867
- Built
- 2006
- 19 years old
- Condition
- Fair
- inspected November 2023
- Type
- Slab
- Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 4,400
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Craig RD over Gowan N Channel is a concrete slab carrying Craig RD over Gowan N Channel in Clark County, Nevada. It was built in 2006, so it is 19 years old, younger than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,400 vehicles a day, roughly 3% of them trucks, projected to reach 9,100 by 2040. The structure is 32 ft (9.7 m) long and 98 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Craig RD over Gowan N Channel built?
It was built in 2006, making it 19 years old in 2025.
What condition is Craig RD over Gowan N Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Craig RD over Gowan N Channel carry?
About 4,400 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is Craig RD over Gowan N Channel?
The structure is 32 ft (9.7 m) long with a longest span of 32 ft (9.7 m) and a deck 98 ft wide.
Who owns Craig RD over Gowan N Channel?
It is owned by the City or Municipal Highway Agency.