Amador Lane over Dry Wash
FairClark County, Nevada · Henderson · Structure no. B2626
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected October 2023
- Type
- Culvert
- Concrete
- Length
- 20 ft
- 1 main span
- Daily traffic
- 506
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Amador Lane over Dry Wash is a concrete culvert carrying Amador Lane over Dry Wash in Clark County, Nevada. It was built in 1999, so it is 26 years old, younger than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 506 vehicles a day, projected to reach 1,046 by 2040. The structure is 20 ft (6.2 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Amador Lane over Dry Wash built?
It was built in 1999, making it 26 years old in 2025.
What condition is Amador Lane over Dry Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Amador Lane over Dry Wash carry?
About 506 vehicles per day (2017 count).
How long is Amador Lane over Dry Wash?
The structure is 20 ft (6.2 m) long with a longest span of 20 ft (6.1 m).
Who owns Amador Lane over Dry Wash?
It is owned by the City or Municipal Highway Agency.