Sandyridge Avenue over Channel
FairClark County, Nevada · Henderson · Structure no. B2596
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected September 2021
- Type
- Culvert
- Concrete
- Length
- 28 ft
- 1 main span
- Daily traffic
- 220
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Sandyridge Avenue over Channel is a concrete culvert carrying Sandyridge Avenue over Channel in Clark County, Nevada. It was built in 1999, so it is 26 years old, younger than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 220 vehicles a day, projected to reach 455 by 2040. The structure is 28 ft (8.5 m) long.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sandyridge Avenue over Channel built?
It was built in 1999, making it 26 years old in 2025.
What condition is Sandyridge Avenue over Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2021.
How much traffic does Sandyridge Avenue over Channel carry?
About 220 vehicles per day (2017 count).
How long is Sandyridge Avenue over Channel?
The structure is 28 ft (8.5 m) long with a longest span of 28 ft (8.5 m).
Who owns Sandyridge Avenue over Channel?
It is owned by the City or Municipal Highway Agency.