US Bridges

Paradise RD over Flamingo Wash

Good

Clark County, Nevada · Las Vegas · Structure no. B2441

Built
1992
33 years old
Condition
Good
inspected February 2021
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
1,000
2017 count
Owner
County
County Highway Agency

About this bridge

Paradise RD over Flamingo Wash is a concrete culvert carrying Paradise RD over Flamingo Wash in Clark County, Nevada. It was built in 1992, so it is 33 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 1% of them trucks, projected to reach 2,068 by 2040. The structure is 31 ft (9.4 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesParadise RD
CrossesFlamingo Wash
LocationLas Vegas
RouteCounty Highway 0
StateNevada
Coordinates36.11647, -115.15466
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.3 US tons
Inventory rating54.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length31 ft (9.4 m)
Longest span15 ft (4.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2017)
Projected traffic2,068 by 2040
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Paradise RD over Flamingo Wash built?

It was built in 1992, making it 33 years old in 2025.

What condition is Paradise RD over Flamingo Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2021.

How much traffic does Paradise RD over Flamingo Wash carry?

About 1,000 vehicles per day (2017 count), of which roughly 1% are trucks.

How long is Paradise RD over Flamingo Wash?

The structure is 31 ft (9.4 m) long with a longest span of 15 ft (4.6 m).

Who owns Paradise RD over Flamingo Wash?

It is owned by the County Highway Agency.