Pavilion Center DR over Dry Wash
FairClark County, Nevada · Summerlin · Structure no. B2414
- Built
- 1998
- 27 years old
- Condition
- Fair
- inspected December 2021
- Type
- Culvert
- Concrete
- Length
- 41 ft
- 3 main spans
- Daily traffic
- 880
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Pavilion Center DR over Dry Wash is a concrete culvert carrying Pavilion Center DR over Dry Wash in Clark County, Nevada. It was built in 1998, so it is 27 years old, younger than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 880 vehicles a day, roughly 5% of them trucks, projected to reach 2,000 by 2034. The structure is 41 ft (12.4 m) long. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pavilion Center DR over Dry Wash built?
It was built in 1998, making it 27 years old in 2025.
What condition is Pavilion Center DR over Dry Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2021.
How much traffic does Pavilion Center DR over Dry Wash carry?
About 880 vehicles per day (2014 count), of which roughly 5% are trucks.
How long is Pavilion Center DR over Dry Wash?
The structure is 41 ft (12.4 m) long with a longest span of 14 ft (4.4 m).
Who owns Pavilion Center DR over Dry Wash?
It is owned by the City or Municipal Highway Agency.