US Bridges

RMPCC215E to Rainb over Channel

Good

Clark County, Nevada · SE Las Vegas · Structure no. B2368

Built
2001
24 years old
Condition
Good
inspected October 2021
Type
Culvert
Concrete
Length
65 ft
1 main span
Daily traffic
5,000
2017 count
Owner
County
County Highway Agency

About this bridge

RMPCC215E to Rainb over Channel is a concrete culvert carrying RMPCC215E to Rainb over Channel in Clark County, Nevada. It was built in 2001, so it is 24 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, roughly 5% of them trucks, projected to reach 7,900 by 2040. The structure is 65 ft (19.8 m) long. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRMPCC215E to Rainb
CrossesChannel
LocationSE Las Vegas
RouteCounty Highway CC215
StateNevada
Coordinates36.06614, -115.24666
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length65 ft (19.8 m)
Longest span65 ft (19.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2017)
Projected traffic7,900 by 2040
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was RMPCC215E to Rainb over Channel built?

It was built in 2001, making it 24 years old in 2025.

What condition is RMPCC215E to Rainb over Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2021.

How much traffic does RMPCC215E to Rainb over Channel carry?

About 5,000 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is RMPCC215E to Rainb over Channel?

The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m).

Who owns RMPCC215E to Rainb over Channel?

It is owned by the County Highway Agency.