US Bridges

Sun City Boulevard over Golf Course Drainage

Good

Clark County, Nevada · Norhwest Las Vegas · Structure no. B2252

Built
1992
33 years old
Condition
Good
inspected January 2024
Type
Culvert
Concrete
Length
34 ft
2 main spans
Daily traffic
2,200
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Sun City Boulevard over Golf Course Drainage is a concrete culvert carrying Sun City Boulevard over Golf Course Drainage in Clark County, Nevada. It was built in 1992, so it is 33 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,200 vehicles a day, roughly 5% of them trucks, projected to reach 4,550 by 2040. The structure is 34 ft (10.4 m) long. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSun City Boulevard
CrossesGolf Course Drainage
LocationNorhwest Las Vegas
RouteCity Street 0
StateNevada
Coordinates36.2125, -115.30503
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating21.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length34 ft (10.4 m)
Longest span17 ft (5.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,200 (2017)
Projected traffic4,550 by 2040
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sun City Boulevard over Golf Course Drainage built?

It was built in 1992, making it 33 years old in 2025.

What condition is Sun City Boulevard over Golf Course Drainage in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Sun City Boulevard over Golf Course Drainage carry?

About 2,200 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Sun City Boulevard over Golf Course Drainage?

The structure is 34 ft (10.4 m) long with a longest span of 17 ft (5.2 m).

Who owns Sun City Boulevard over Golf Course Drainage?

It is owned by the City or Municipal Highway Agency.