US Bridges

Patrick LN over Duck Creek

Good

Clark County, Nevada · South East of Las Vegas · Structure no. B2071

Built
1994
31 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
131 ft
2 main spans
Daily traffic
7,600
2017 count
Owner
County
County Highway Agency

About this bridge

Patrick LN over Duck Creek is a prestressed concrete stringer/multi-beam or girder carrying Patrick LN over Duck Creek in Clark County, Nevada. It was built in 1994, so it is 31 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,600 vehicles a day, projected to reach 15,718 by 2040. The structure is 131 ft (40 m) long and 72 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPatrick LN
CrossesDuck Creek
LocationSouth East of Las Vegas
RouteCounty Highway 0
StateNevada
Coordinates36.07782, -115.08314
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.5 US tons
Inventory rating34.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length131 ft (40 m)
Longest span65 ft (19.7 m)
Deck width72 ft (22 m)
Roadway width54 ft (16.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,600 (2017)
Projected traffic15,718 by 2040
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Patrick LN over Duck Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is Patrick LN over Duck Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Patrick LN over Duck Creek carry?

About 7,600 vehicles per day (2017 count).

How long is Patrick LN over Duck Creek?

The structure is 131 ft (40 m) long with a longest span of 65 ft (19.7 m) and a deck 72 ft wide.

Who owns Patrick LN over Duck Creek?

It is owned by the County Highway Agency.