US Bridges

Cameron Street over Flamingo Wash

Good

Clark County, Nevada · Las Vegas · Structure no. B1865

Built
1988
37 years old
Condition
Good
inspected February 2023
Type
Culvert
Concrete
Length
74 ft
7 main spans
Daily traffic
18,000
2017 count
Owner
County
County Highway Agency

About this bridge

Cameron Street over Flamingo Wash is a concrete culvert carrying Cameron Street over Flamingo Wash in Clark County, Nevada. It was built in 1988, so it is 37 years old, older than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,000 vehicles a day, roughly 1% of them trucks, projected to reach 37,226 by 2040. The structure is 74 ft (22.6 m) long and 48 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesCameron Street
CrossesFlamingo Wash
LocationLas Vegas
RouteCity Street 0
StateNevada
Coordinates36.10304, -115.20392
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length74 ft (22.6 m)
Longest span10 ft (3 m)
Deck width48 ft (14.6 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,000 (2017)
Projected traffic37,226 by 2040
Trucks1%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Cameron Street over Flamingo Wash built?

It was built in 1988, making it 37 years old in 2025.

What condition is Cameron Street over Flamingo Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Cameron Street over Flamingo Wash carry?

About 18,000 vehicles per day (2017 count), of which roughly 1% are trucks.

How long is Cameron Street over Flamingo Wash?

The structure is 74 ft (22.6 m) long with a longest span of 10 ft (3 m) and a deck 48 ft wide.

Who owns Cameron Street over Flamingo Wash?

It is owned by the County Highway Agency.