Pecos Rd. over Flamingo Wash
FairClark County, Nevada · Las Vegas · Structure no. B1560
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 104 ft
- 1 main span
- Daily traffic
- 18,000
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Pecos Rd. over Flamingo Wash is a prestressed concrete stringer/multi-beam or girder carrying Pecos Rd. over Flamingo Wash in Clark County, Nevada. It was built in 1977, so it is 48 years old, older than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 18,000 vehicles a day, roughly 4% of them trucks, projected to reach 37,226 by 2040. The structure is 104 ft (31.7 m) long and 102 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pecos Rd. over Flamingo Wash built?
It was built in 1977, making it 48 years old in 2025.
What condition is Pecos Rd. over Flamingo Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Pecos Rd. over Flamingo Wash carry?
About 18,000 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pecos Rd. over Flamingo Wash?
The structure is 104 ft (31.7 m) long with a longest span of 100 ft (30.5 m) and a deck 102 ft wide.
Who owns Pecos Rd. over Flamingo Wash?
It is owned by the County Highway Agency.