BIA IRR RTE 191 over Canal
FairPosted for loadChurchill County, Nevada · Behind Tribal Clinic · Structure no. 0000H61645B0335
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 70 ft
- 1 main span
- Daily traffic
- 5
- 2024 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
BIA IRR RTE 191 over Canal is a steel stringer/multi-beam or girder carrying BIA IRR RTE 191 over Canal in Churchill County, Nevada. It was built in 1980, so it is 45 years old, older than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 5 vehicles a day, roughly 1% of them trucks, projected to reach 12 by 2044. The structure is 70 ft (21.4 m) long and 14 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was BIA IRR RTE 191 over Canal built?
It was built in 1980, making it 45 years old in 2025.
What condition is BIA IRR RTE 191 over Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does BIA IRR RTE 191 over Canal carry?
About 5 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is BIA IRR RTE 191 over Canal?
The structure is 70 ft (21.4 m) long with a longest span of 67 ft (20.5 m) and a deck 14 ft wide.
Who owns BIA IRR RTE 191 over Canal?
It is owned by the Bureau of Indian Affairs.