I-25 Nbl over Aragon ROAD(FR-4228)
FairValencia County, New Mexico · 2.8 MI N of S Belen Inchg · Structure no. 000000000007129
- Built
- 1970
- 55 years old, rebuilt 1990
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 135 ft
- 3 main spans
- Daily traffic
- 15,903
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Nbl over Aragon ROAD(FR-4228) is a prestressed concrete stringer/multi-beam or girder carrying I-25 Nbl over Aragon ROAD(FR-4228) in Valencia County, New Mexico. It was built in 1970 and reconstructed in 1990, so it is 55 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,903 vehicles a day, roughly 45% of them trucks, projected to reach 21,628 by 2043. The structure is 135 ft (41.1 m) long and 45 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Nbl over Aragon ROAD(FR-4228) built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 1990.
What condition is I-25 Nbl over Aragon ROAD(FR-4228) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does I-25 Nbl over Aragon ROAD(FR-4228) carry?
About 15,903 vehicles per day (2023 count), of which roughly 45% are trucks.
How long is I-25 Nbl over Aragon ROAD(FR-4228)?
The structure is 135 ft (41.1 m) long with a longest span of 54 ft (16.5 m) and a deck 45 ft wide.
Who owns I-25 Nbl over Aragon ROAD(FR-4228)?
It is owned by the State Highway Agency.