US Bridges

I-25 Sbl over Ojitos Arroyo

Good

Socorro County, New Mexico · 1.65 M S JCT I-25/NM-408 · Structure no. 000000000009770

Built
2019
6 years old
Condition
Good
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
135 ft
3 main spans
Daily traffic
11,555
2018 count
Owner
State
State Highway Agency

About this bridge

I-25 Sbl over Ojitos Arroyo is a prestressed concrete continuous box beam or girders - multiple carrying I-25 Sbl over Ojitos Arroyo in Socorro County, New Mexico. It was built in 2019, so it is 6 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,555 vehicles a day, projected to reach 17,170 by 2038. The structure is 135 ft (41.1 m) long and 41 ft wide.

CarriesI-25 Sbl
CrossesOjitos Arroyo
Location1.65 M S JCT I-25/NM-408
RouteInterstate 25
Coordinates34.135, -106.90992
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating101.5 US tons
Inventory rating60.8 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length135 ft (41.1 m)
Longest span45 ft (13.6 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,555 (2018)
Projected traffic17,170 by 2038
Trucks—
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-25 Sbl over Ojitos Arroyo built?

It was built in 2019, making it 6 years old in 2025.

What condition is I-25 Sbl over Ojitos Arroyo in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does I-25 Sbl over Ojitos Arroyo carry?

About 11,555 vehicles per day (2018 count).

How long is I-25 Sbl over Ojitos Arroyo?

The structure is 135 ft (41.1 m) long with a longest span of 45 ft (13.6 m) and a deck 41 ft wide.

Who owns I-25 Sbl over Ojitos Arroyo?

It is owned by the State Highway Agency.