US Bridges

US-380 over Taylor Canyon

Fair

Socorro County, New Mexico · 18.2 MI W of US54/CARRIZO · Structure no. 000000000008462

Built
1981
44 years old
Condition
Fair
inspected January 2025
Type
Culvert
Steel
Length
34 ft
1 main span
Daily traffic
1,831
2023 count
Owner
State
State Highway Agency

About this bridge

US-380 over Taylor Canyon is a steel culvert carrying US-380 over Taylor Canyon in Socorro County, New Mexico. It was built in 1981, so it is 44 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,831 vehicles a day, roughly 11% of them trucks, projected to reach 2,490 by 2043. The structure is 34 ft (10.4 m) long. If it were closed, the detour would be 98.8 mi (159 km).

CarriesUS-380
CrossesTaylor Canyon
Location18.2 MI W of US54/CARRIZO
RouteU.S. Route 380
Coordinates33.76462, -106.12896
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans1
Design loadHS 20
Structure length34 ft (10.4 m)
Longest span34 ft (10.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,831 (2023)
Projected traffic2,490 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US-380 over Taylor Canyon built?

It was built in 1981, making it 44 years old in 2025.

What condition is US-380 over Taylor Canyon in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does US-380 over Taylor Canyon carry?

About 1,831 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is US-380 over Taylor Canyon?

The structure is 34 ft (10.4 m) long with a longest span of 34 ft (10.4 m).

Who owns US-380 over Taylor Canyon?

It is owned by the State Highway Agency.