US Bridges

US-60 over Bear Canyon

Fair

Socorro County, New Mexico · 7.2 MI W JCT US-60/I-25 · Structure no. 000000000006358

Built
1962
63 years old
Condition
Fair
inspected February 2025
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
158 ft
3 main spans
Daily traffic
4,480
2023 count
Owner
State
State Highway Agency

About this bridge

US-60 over Bear Canyon is a steel continuous stringer/multi-beam or girder carrying US-60 over Bear Canyon in Socorro County, New Mexico. It was built in 1962, so it is 63 years old, older than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,480 vehicles a day, roughly 17% of them trucks, projected to reach 6,092 by 2043. The structure is 158 ft (48.2 m) long and 31 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesUS-60
CrossesBear Canyon
Location7.2 MI W JCT US-60/I-25
RouteU.S. Route 60
Coordinates34.00616, -106.98756
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.8 US tons
Inventory rating39.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length158 ft (48.2 m)
Longest span60 ft (18.3 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,480 (2023)
Projected traffic6,092 by 2043
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$366,000 (2030 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was US-60 over Bear Canyon built?

It was built in 1962, making it 63 years old in 2025.

What condition is US-60 over Bear Canyon in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does US-60 over Bear Canyon carry?

About 4,480 vehicles per day (2023 count), of which roughly 17% are trucks.

How long is US-60 over Bear Canyon?

The structure is 158 ft (48.2 m) long with a longest span of 60 ft (18.3 m) and a deck 31 ft wide.

Who owns US-60 over Bear Canyon?

It is owned by the State Highway Agency.