US Bridges

I-25 Nbl/Sbl over Cedar Canyon

Fair

Sierra County, New Mexico · 3.1 MI N of NM-181 · Structure no. 000000000006895

Built
1967
58 years old, rebuilt 1972
Condition
Fair
inspected June 2024
Type
Culvert
Concrete
Length
20 ft
2 main spans
Daily traffic
6,522
2023 count
Owner
State
State Highway Agency

About this bridge

I-25 Nbl/Sbl over Cedar Canyon is a concrete culvert carrying I-25 Nbl/Sbl over Cedar Canyon in Sierra County, New Mexico. It was built in 1967 and reconstructed in 1972, so it is 58 years old, older than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,522 vehicles a day, roughly 45% of them trucks, projected to reach 8,869 by 2043. The structure is 20 ft (6.2 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-25 Nbl/Sbl
CrossesCedar Canyon
Location3.1 MI N of NM-181
RouteInterstate 25
Coordinates33.26695, -107.26991
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating108 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length20 ft (6.2 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,522 (2023)
Projected traffic8,869 by 2043
Trucks45%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-25 Nbl/Sbl over Cedar Canyon built?

It was built in 1967, making it 58 years old in 2025. It was reconstructed in 1972.

What condition is I-25 Nbl/Sbl over Cedar Canyon in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does I-25 Nbl/Sbl over Cedar Canyon carry?

About 6,522 vehicles per day (2023 count), of which roughly 45% are trucks.

How long is I-25 Nbl/Sbl over Cedar Canyon?

The structure is 20 ft (6.2 m) long with a longest span of 10 ft (3 m).

Who owns I-25 Nbl/Sbl over Cedar Canyon?

It is owned by the State Highway Agency.