NM-152 over Percha Creek
FairSierra County, New Mexico · 0.3 MI E JCT Nm 27/NM 152 · Structure no. 000000000006267
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 157 ft
- 5 main spans
- Daily traffic
- 428
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
NM-152 over Percha Creek is a prestressed concrete box beam or girders - multiple carrying NM-152 over Percha Creek in Sierra County, New Mexico. It was built in 1961, so it is 64 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 428 vehicles a day, roughly 11% of them trucks, projected to reach 582 by 2043. The structure is 157 ft (47.9 m) long and 30 ft wide. If it were closed, the detour would be 55.9 mi (90 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NM-152 over Percha Creek built?
It was built in 1961, making it 64 years old in 2025.
What condition is NM-152 over Percha Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does NM-152 over Percha Creek carry?
About 428 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is NM-152 over Percha Creek?
The structure is 157 ft (47.9 m) long with a longest span of 31 ft (9.4 m) and a deck 30 ft wide.
Who owns NM-152 over Percha Creek?
It is owned by the State Highway Agency.