I-25 Nbl/Sbl over Penasco-Canyon
FairSierra County, New Mexico · 20.7 MI N of JCT NM-51 · Structure no. 000000000002080
- Built
- 1938
- 87 years old, rebuilt 1967
- Condition
- Fair
- inspected April 2024
- Type
- Culvert
- Concrete
- Length
- 46 ft
- 5 main spans
- Daily traffic
- 5,806
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Nbl/Sbl over Penasco-Canyon is a concrete culvert carrying I-25 Nbl/Sbl over Penasco-Canyon in Sierra County, New Mexico. It was built in 1938 and reconstructed in 1967, so it is 87 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,806 vehicles a day, roughly 45% of them trucks, projected to reach 7,896 by 2043. The structure is 46 ft (14 m) long. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Nbl/Sbl over Penasco-Canyon built?
It was built in 1938, making it 87 years old in 2025. It was reconstructed in 1967.
What condition is I-25 Nbl/Sbl over Penasco-Canyon in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does I-25 Nbl/Sbl over Penasco-Canyon carry?
About 5,806 vehicles per day (2023 count), of which roughly 45% are trucks.
How long is I-25 Nbl/Sbl over Penasco-Canyon?
The structure is 46 ft (14 m) long with a longest span of 9 ft (2.7 m).
Who owns I-25 Nbl/Sbl over Penasco-Canyon?
It is owned by the State Highway Agency.