US Bridges

I-25 Nbl/Sbl over Mitchell Canyon

Fair

Sierra County, New Mexico · 0.26 MI N of Exit 92 · Structure no. 000000000002075

Built
1938
87 years old
Condition
Fair
inspected August 2023
Type
Culvert
Concrete
Length
32 ft
5 main spans
Daily traffic
5,806
2023 count
Owner
State
State Highway Agency

About this bridge

I-25 Nbl/Sbl over Mitchell Canyon is a concrete culvert carrying I-25 Nbl/Sbl over Mitchell Canyon in Sierra County, New Mexico. It was built in 1938, so it is 87 years old, older than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,806 vehicles a day, roughly 45% of them trucks, projected to reach 7,896 by 2043. The structure is 32 ft (9.7 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesI-25 Nbl/Sbl
CrossesMitchell Canyon
Location0.26 MI N of Exit 92
RouteInterstate 25
Coordinates33.33408, -107.29229
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating37.8 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadH 15
Structure length32 ft (9.7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,806 (2023)
Projected traffic7,896 by 2043
Trucks45%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-25 Nbl/Sbl over Mitchell Canyon built?

It was built in 1938, making it 87 years old in 2025.

What condition is I-25 Nbl/Sbl over Mitchell Canyon in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does I-25 Nbl/Sbl over Mitchell Canyon carry?

About 5,806 vehicles per day (2023 count), of which roughly 45% are trucks.

How long is I-25 Nbl/Sbl over Mitchell Canyon?

The structure is 32 ft (9.7 m) long with a longest span of 10 ft (3 m).

Who owns I-25 Nbl/Sbl over Mitchell Canyon?

It is owned by the State Highway Agency.