US-84/285 over County Road 73
GoodSanta Fe County, New Mexico · US-84/285 S Tesuque · Structure no. 000000000009181
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 96 ft
- 1 main span
- Daily traffic
- 36,888
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US-84/285 over County Road 73 is a prestressed concrete stringer/multi-beam or girder carrying US-84/285 over County Road 73 in Santa Fe County, New Mexico. It was built in 2004, so it is 21 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 36,888 vehicles a day, roughly 17% of them trucks, projected to reach 50,167 by 2043. The structure is 96 ft (29.3 m) long and 103 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US-84/285 over County Road 73 built?
It was built in 2004, making it 21 years old in 2025.
What condition is US-84/285 over County Road 73 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does US-84/285 over County Road 73 carry?
About 36,888 vehicles per day (2023 count), of which roughly 17% are trucks.
How long is US-84/285 over County Road 73?
The structure is 96 ft (29.3 m) long with a longest span of 92 ft (28 m) and a deck 103 ft wide.
Who owns US-84/285 over County Road 73?
It is owned by the State Highway Agency.