I-25 Nbl over Waldo Exit FR2097
FairSanta Fe County, New Mexico · 2.6 M N JCT I-25/ NM-16 · Structure no. 000000000007175
- Built
- 1972
- 53 years old, rebuilt 2003
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 144 ft
- 3 main spans
- Daily traffic
- 39,978
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Nbl over Waldo Exit FR2097 is a prestressed concrete stringer/multi-beam or girder carrying I-25 Nbl over Waldo Exit FR2097 in Santa Fe County, New Mexico. It was built in 1972 and reconstructed in 2003, so it is 53 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 39,978 vehicles a day, roughly 45% of them trucks, projected to reach 54,370 by 2043. The structure is 144 ft (43.9 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Nbl over Waldo Exit FR2097 built?
It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2003.
What condition is I-25 Nbl over Waldo Exit FR2097 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does I-25 Nbl over Waldo Exit FR2097 carry?
About 39,978 vehicles per day (2023 count), of which roughly 45% are trucks.
How long is I-25 Nbl over Waldo Exit FR2097?
The structure is 144 ft (43.9 m) long with a longest span of 55 ft (16.8 m) and a deck 45 ft wide.
Who owns I-25 Nbl over Waldo Exit FR2097?
It is owned by the State Highway Agency.