US Bridges

47-B41A over Pecos River

Good

San Miguel County, New Mexico · 1.2 M N JCT I-25 Fr@sands · Structure no. 000000000009132

Built
1999
26 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
60 ft
1 main span
Daily traffic
210
2023 count
Owner
County
County Highway Agency

About this bridge

47-B41A over Pecos River is a steel stringer/multi-beam or girder carrying 47-B41A over Pecos River in San Miguel County, New Mexico. It was built in 1999, so it is 26 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 210 vehicles a day, projected to reach 285 by 2043. The structure is 60 ft (18.3 m) long and 16 ft wide.

Carries47-B41A
CrossesPecos River
Location1.2 M N JCT I-25 Fr@sands
RouteCounty Highway 47041
Coordinates35.41696, -105.49365
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating59 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span59 ft (18 m)
Deck width16 ft (4.9 m)
Roadway width14 ft (4.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic210 (2023)
Projected traffic285 by 2043
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$57,000 (2030 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was 47-B41A over Pecos River built?

It was built in 1999, making it 26 years old in 2025.

What condition is 47-B41A over Pecos River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does 47-B41A over Pecos River carry?

About 210 vehicles per day (2023 count).

How long is 47-B41A over Pecos River?

The structure is 60 ft (18.3 m) long with a longest span of 59 ft (18 m) and a deck 16 ft wide.

Who owns 47-B41A over Pecos River?

It is owned by the County Highway Agency.