US Bridges

FR-2183 over Pecos Arroyo

Fair

San Miguel County, New Mexico · 0.3 MI S of JCT NM-104 · Structure no. 000000000008011

Built
1981
44 years old
Condition
Fair
inspected June 2023
Type
Slab
Concrete Continuous
Length
115 ft
4 main spans
Daily traffic
250
2023 count
Owner
State
State Highway Agency

About this bridge

FR-2183 over Pecos Arroyo is a concrete continuous slab carrying FR-2183 over Pecos Arroyo in San Miguel County, New Mexico. It was built in 1981, so it is 44 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 250 vehicles a day, roughly 6% of them trucks, projected to reach 340 by 2043. The structure is 115 ft (35.1 m) long and 45 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFR-2183
CrossesPecos Arroyo
Location0.3 MI S of JCT NM-104
RouteState Highway 2183
Coordinates35.59196, -105.20862
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.1 US tons
Inventory rating37.8 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length115 ft (35.1 m)
Longest span32 ft (9.8 m)
Deck width45 ft (13.7 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic250 (2023)
Projected traffic340 by 2043
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FR-2183 over Pecos Arroyo built?

It was built in 1981, making it 44 years old in 2025.

What condition is FR-2183 over Pecos Arroyo in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does FR-2183 over Pecos Arroyo carry?

About 250 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is FR-2183 over Pecos Arroyo?

The structure is 115 ft (35.1 m) long with a longest span of 32 ft (9.8 m) and a deck 45 ft wide.

Who owns FR-2183 over Pecos Arroyo?

It is owned by the State Highway Agency.