IRR BIA RTE N562 over Fruitland Canal
FairSan Juan County, New Mexico · 0.4 KM N of N36 · Structure no. 00000000000N266
- Built
- 2006
- 19 years old
- Condition
- Fair
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 1,150
- 2022 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE N562 over Fruitland Canal is a prestressed concrete box beam or girders - multiple carrying IRR BIA RTE N562 over Fruitland Canal in San Juan County, New Mexico. It was built in 2006, so it is 19 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,150 vehicles a day, roughly 15% of them trucks, projected to reach 2,170 by 2040. The structure is 32 ft (9.9 m) long and 36 ft wide. If it were closed, the detour would be 18 mi (29 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE N562 over Fruitland Canal built?
It was built in 2006, making it 19 years old in 2025.
What condition is IRR BIA RTE N562 over Fruitland Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does IRR BIA RTE N562 over Fruitland Canal carry?
About 1,150 vehicles per day (2022 count), of which roughly 15% are trucks.
How long is IRR BIA RTE N562 over Fruitland Canal?
The structure is 32 ft (9.9 m) long with a longest span of 29 ft (8.8 m) and a deck 36 ft wide.
Who owns IRR BIA RTE N562 over Fruitland Canal?
It is owned by the Bureau of Indian Affairs.