45-5500 over San Juan River
GoodSan Juan County, New Mexico · 0.80 MI S of JCT US 64 · Structure no. 000000000009835
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 205 ft
- 2 main spans
- Daily traffic
- 3,063
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
45-5500 over San Juan River is a concrete stringer/multi-beam or girder carrying 45-5500 over San Juan River in San Juan County, New Mexico. It was built in 2022, so it is 3 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,063 vehicles a day, roughly 21% of them trucks, projected to reach 2,632 by 2040. The structure is 205 ft (62.6 m) long and 49 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 45-5500 over San Juan River built?
It was built in 2022, making it 3 years old in 2025.
What condition is 45-5500 over San Juan River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does 45-5500 over San Juan River carry?
About 3,063 vehicles per day (2020 count), of which roughly 21% are trucks.
How long is 45-5500 over San Juan River?
The structure is 205 ft (62.6 m) long with a longest span of 141 ft (43 m) and a deck 49 ft wide.
Who owns 45-5500 over San Juan River?
It is owned by the County Highway Agency.