FL-4385 over Glade Arroyo
FairSan Juan County, New Mexico · 0.2 MI N Main St/Farmingt · Structure no. 000000000008042
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 114 ft
- 2 main spans
- Daily traffic
- 4,458
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FL-4385 over Glade Arroyo is a prestressed concrete continuous stringer/multi-beam or girder carrying FL-4385 over Glade Arroyo in San Juan County, New Mexico. It was built in 1977, so it is 48 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,458 vehicles a day, roughly 5% of them trucks, projected to reach 6,062 by 2043. The structure is 114 ft (34.7 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FL-4385 over Glade Arroyo built?
It was built in 1977, making it 48 years old in 2025.
What condition is FL-4385 over Glade Arroyo in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does FL-4385 over Glade Arroyo carry?
About 4,458 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is FL-4385 over Glade Arroyo?
The structure is 114 ft (34.7 m) long with a longest span of 55 ft (16.8 m) and a deck 58 ft wide.
Who owns FL-4385 over Glade Arroyo?
It is owned by the City or Municipal Highway Agency.