IRR BIA RTE 82 over Jemez River
GoodSandoval County, New Mexico · 0.7KM West of Jemez Puebl · Structure no. 0000M20706T0104
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 124 ft
- 3 main spans
- Daily traffic
- 100
- 2023 count
- Owner
- Tribal
- Indian Tribal Government
About this bridge
IRR BIA RTE 82 over Jemez River is a steel stringer/multi-beam or girder carrying IRR BIA RTE 82 over Jemez River in Sandoval County, New Mexico. It was built in 2023, so it is 2 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 125 by 2043. The structure is 124 ft (37.9 m) long and 37 ft wide. If it were closed, the detour would be 4.3 mi (7 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 82 over Jemez River built?
It was built in 2023, making it 2 years old in 2025.
What condition is IRR BIA RTE 82 over Jemez River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does IRR BIA RTE 82 over Jemez River carry?
About 100 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is IRR BIA RTE 82 over Jemez River?
The structure is 124 ft (37.9 m) long with a longest span of 41 ft (12.6 m) and a deck 37 ft wide.
Who owns IRR BIA RTE 82 over Jemez River?
It is owned by the Indian Tribal Government.