US Bridges

IRR BIA RTE 78 over Chamisa Wash

Good

Sandoval County, New Mexico · East Edge of Zia Pueblo · Structure no. 00000000000M140

Built
1997
28 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Concrete Continuous
Length
163 ft
3 main spans
Daily traffic
150
2023 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE 78 over Chamisa Wash is a concrete continuous stringer/multi-beam or girder carrying IRR BIA RTE 78 over Chamisa Wash in Sandoval County, New Mexico. It was built in 1997, so it is 28 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, roughly 5% of them trucks, projected to reach 176 by 2043. The structure is 163 ft (49.7 m) long and 53 ft wide. If it were closed, the detour would be 26.7 mi (43 km).

CarriesIRR BIA RTE 78
CrossesChamisa Wash
LocationEast Edge of Zia Pueblo
RouteFederal Lands Road 78
Coordinates35.5058, -106.7177
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating39.4 US tons
Inventory rating29.5 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length163 ft (49.7 m)
Longest span63 ft (19.1 m)
Deck width53 ft (16.3 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2023)
Projected traffic176 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed26.7 mi (43 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IRR BIA RTE 78 over Chamisa Wash built?

It was built in 1997, making it 28 years old in 2025.

What condition is IRR BIA RTE 78 over Chamisa Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does IRR BIA RTE 78 over Chamisa Wash carry?

About 150 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is IRR BIA RTE 78 over Chamisa Wash?

The structure is 163 ft (49.7 m) long with a longest span of 63 ft (19.1 m) and a deck 53 ft wide.

Who owns IRR BIA RTE 78 over Chamisa Wash?

It is owned by the Bureau of Indian Affairs.